< Passumpsic AO-107

Passumpsic AO-107

 

Passumpsic
(AO-107: dp. 7,423; 1. 553', b. 75'; dr. 32', s. 18.3 k.; cpl. 304;
a. 1 5", 4 3", 8 40mm., cl. Mispillion, T. T3-S2-A3)

Passumpsic (AO-107) was laid down 8 March 1945 as M.C. Hull 2703 by Sun Shipbuilding and Drydock Co., Chester, Pa.; launched 31 October; sponsored by Mrs. M.F. Draemel wife of Rear Admiral Milo F. Draemel, then Commandant of the 4th Naval District, and commissioned 1 April 1946, Capt. C.M. Ryan in command.

After a Caribbean shakedown, Passumpsie operated out of Long Beach, Calif. under the control of Commander, Service Force Pacific servicing Pacific Pleet units while attached to Service Squadrons 1 and 3.

Passumpsie has called at Japan, Taiwan, Korea, Southeast Asia, Hong Kong, North Borneo, the Fiji Islands, Australia, Arabia, and Ceylon. She has also visited the Philippines Midway, Oahu, and islands in the Marshall and Mariana groups.

From June 1950 through February 1954, Passumpsie spent 34 of 44 months outside of the U. S. Though not subjected to hostile fire during the Korean War, she received 9 of 10 battle stars awarded to U.S. ships during that conflict.

Passumpsic's assignments since Korea have entailed annual WestPac deployments. Upon return from deployment in April 1964, Passumpsie underwent an INSURV Board Inspeetion at Long Beaeh Naval Shipyard in preparation for "Jumboization," a project of modernization and renovation for AO-22 class fleet oilers. She steamed 12 October for the American Shipbuilding Co. yard at Lorain, Ohio, where the conversion was to take place. At Boston Naval Shipyard a Supply Overhaul Assistanee Program (SOAP) was set up to sort, identify, and repackage the ship's stock of repair parts and to receive, sort, and stow the repair parts supplied by the contractor and the Navy in conjunction with the conversion programs. After passage through the St. Lawrenee Seaway, Passumpsie was placed "in commission, in reserve" 26 November and most of her crew detached, leaving a nucleus party of 28 men and 4 officers. The ship was then turned over to the American Shipbuilding Co.

The conversion involved transferring her existing midships superstructure to a newly eonstrueted tank section. The orig~nal hull was cut and the bow and stern sections were added to the new tank section. Conversion mod)fidations increased Passumpsie's length by 91 feet, her full load displacement from 25,500 to 34,350 tons, and her maximum draft from 32 to 36 feet.

Passumpsie departed Lorain 22 November 1965 with a merchant marine master and civilian crew. She arrived at the Boston Army Base piers, South Boston, 1 December.

Aeeepted by the Navy at Boston 10 January 1966, Pas~umpsie fitted out at Boston Naval Shipyard throughout February and into March, departing 5 March for Norfolk, Va. for POL loading and degaussing inspection.

Passumpsie steamed 11 March for her homeport of Long Beach, Calif., arriving 6 April. Final Navy aceeptanee eame 24 August and designation as ready unit under CTG 13.1 on 1 September.

She steamed 22 September and arrived Subic Bay, P.I. 15 October. From Subic the oiler steamed on replenishment operations off the coasts of North and South Vietnam. She continued to service WestPae units until May 1967, when she returned to her homeport.

November of both 1967 and 1968 witnessed Passumpsie's departure for WestPae. Both deployments covered a time span of seven months, and during both the oiler operated from

Subic Bay to the Vietnam combat zone, making thc traditional port visits between unrep assignments. She returned to Long Beach 27 June 1969 for yard availability, local training operations, and preparations for her next WestPae deployment.

Passumpsie received nine battle stars for Korean War service.